Dec 5th The team have been working on the wings this week. Adjusting and aligning the fixing points on the fuselage and wings, and elevator and flap control rods.
Dec 12th . More Wires and fuel lines. and a lot more from Mike "Dremel" Page and his Egg whisk. Dec 19th most of the build is now finished.
Jan 2008. After the Christmas break work starts on removing the wings and flaps, all parts have a final rubbing down, this takes a lot of time.
Jan 22 and the Jab is sent to get its paint job. Feb 6th The Jab came back from the paint shop, and on the13th it was off again to have the upholstery fitted.
11th March. The Jab is back again, now it has a prop and is ready for the final assembly of its wings and doors.
Go to next page. March 20th --